Customer Success Story
Ankeny, Iowa
Power Tools & Woodworking

Caught Up in No Time:
Same-Day Fulfillment After Peak

Four days of post-peak catch-up. Cut to same-day — without replacing the WMS or adding headcount.

Solution Infios WMS Optimization
Partnership 2–3 Years, Ongoing
Location Ankeny, Iowa

Watch the full interview with Donovan

Your team came in and immediately understood our processes, how we were using our WMS. There wasn't a big time spent getting acclimated. That made the whole process a lot more efficient.
Donovan, Director of Operations, Kreg Tool

A New Facility, New Complexity, and a System That Needed a Partner

Kreg Tool has spent decades helping people build things they're proud of. From the iconic pocket hole jig that started it all to a full line of cutting, joining, and hardware solutions — and now a brand-new battery-powered platform — Kreg has always been about making woodworking more approachable.

When Kreg moved into its new facility in Ankeny, Iowa in 2021, they brought a conveyor-based pick-and-pack system with them. A new WMS from a separate vendor went live to support it. And for a while, things stabilized.

But stabilized isn't the same as optimized.

"Launching a new WMS is complex enough. We got it stabilized, but then we realized there's a lot of efficiencies we could gain. That's when we found E2."

— Donovan, Director of Operations, Kreg Tool

Pack stations weren't running lean. Pickers were assigning LPNs item by item, one scan at a time. Single-line orders were routed into individual totes — 100 orders meant 100 totes flowing through the system. And with a booming direct-to-consumer business alongside major retail partners like Lowe's and Home Depot, peak season pressure was real.

When Cyber Monday hit, it used to hit hard. Orders piled up Thursday through Sunday, and the warehouse spent until Wednesday or Thursday of the following week digging out. Four days of catch-up after a four-day holiday. Kreg knew what they wanted to fix. They just needed the right partner to get there.

Simplicity That Scales

E2 came in with a clear scope: two phased improvement projects — both tied directly to Kreg's busiest season on the calendar. The hard deadline was non-negotiable: get it done before peak.

Phase 1

Pack Station Overhaul

Instead of scanning every item to an LPN as it went into a box, E2 redesigned the workflow so operators build the box first, scan all items in, then assign the LPN at the end. One scan instead of ten. Fewer packers per shift, less cognitive load, and a box selector tool so operators stopped guessing carton size. The system recommends it. Operators scan it. Done.

Phase 2

Picking Process Redesign

Under the old model, each tote held one order. 100 single-item orders meant 100 totes. E2 built logic that maximizes each tote, filling it with as many single-line, single-quantity orders as possible. Now a packer grabs a tote, scans an item, gets a box recommendation, packs, labels, ships, and repeats until the tote is empty. Ten to fifteen orders from one tote. Operators can rotate in and out without prior experience — the system guides every step.

Compliance

Lithium-Ion Shipping Automation

Kreg's newest product line brought DOT lithium-ion shipping requirements into the mix: different amp-hour ratings, different labeling rules, tools shipped with batteries versus batteries shipped alone. E2 built a logic matrix directly into the pack station workflow. When an operator is packing an order with lithium-ion batteries, the system tells them exactly which label to grab — and validates they grabbed the right one before the box closes.

"The operators don't have to second guess. They don't have to understand the regulations. It's straightforward. We're 100% compliant at the end of the day."

— Donovan, Director of Operations, Kreg Tool

Peak Season Went From Crisis to Routine

The transformation played out in measurable phases. After Phase 1, catch-up time dropped from four days to two. After Phase 2, Kreg was done by end of day one.

Metric Before E2 After Phase 1 After Phase 2
Cyber Monday catch-up time Wed–Thu (3–4 days) End of Tuesday (2 days) End of Day 1 ✓#10003;
Orders per tote pass 1 order per tote Improved routing 10–15 orders per tote
Warehouse headcount (shipping) 22–26 people Reduced ~11 in shipping
Lithium-ion compliance Manual tribal knowledge 100% automated validation
Operator onboarding Experience-dependent Simplified scan flow System-guided, no prior experience needed

"We were basically caught up at the end of day one. The expectation is we're going to ship to that customer on our next business day, and we're meeting that."

— Donovan, Director of Operations, Kreg Tool

Seven Outcomes. One Ongoing Partnership.

  • Peak season catch-up cut from 3–4 days down to same-day fulfillment
  • Warehouse labor reduced by 40–50% — faster output with fewer people
  • Guesswork eliminated at pack and pick stations
  • 100% lithium-ion DOT compliance across all shipping scenarios
  • Improved accuracy for major retail partners including Lowe's and Home Depot
  • NPS score in the 80s — well above the 60–70 world-class benchmark
  • Growing internal capability through a collaborative, knowledge-sharing partnership

About Kreg Tool

Founded 1989, by Craig Sommerfeld
Headquarters Ankeny, Iowa
Known For Pocket hole joinery & power tool line
Retail Partners Lowe's, Home Depot + DTC
WMS Platform Infios (formerly Körber)
Partnership Duration 2–3 years (ongoing)
Implementation Scope WMS optimization, pick redesign, pack station overhaul, lithium-ion compliance automation

Why It Worked

When asked what set E2 apart, Donovan kept coming back to one word: partnership. "It wasn't a 'here's your code, now go use it.' We wanted someone who would bring us along the journey. Our internal knowledge base grew through this partnership. We can now solve smaller problems ourselves."

Platform-Deep Expertise

15+ years as a certified Infios/Körber partner. No onboarding ramp — we come in already knowing your system.

Outcome-Focused Scope

Every project scoped around measurable results — faster throughput, less labor, zero compliance risk.

Knowledge Transfer Built In

Our goal is to raise your team's capability, not create dependency. Kreg now resolves smaller issues independently.

Your Peak Season Shouldn't Take a Week to Recover From

If your warehouse is still playing catch-up after your busiest days, you're leaving real money on the table. We've helped businesses like Kreg Tool transform fulfillment operations from reactive to smooth and scalable — without replacing your platform.

Book a Discovery Meeting →
🇺🇸 100% USA-Based Team 15+ Years Certified Infios Partner Minnesota HQ

EXPERIENCE MATTERS. MEET OUR CUSTOMERS

Ashley Homestore Logo
Chewy Logo
Boot Barn
FTD Logo
Gilt Logo
Hamilton Logo
Homemakers Logo
Inmar Logo
Eleventh Image Lemans
Lion Logo
Sears Logo
Parts Unlimited Logo
Sheetz Logo
MGA Logo

Industries Served

Distribution Centers & 3PL

Automotive & small Parts

Airlines & Aviation

REtail

Grocery & COLD STORAGE

Furniture

Pharmaceutical & Medical Supply

eCommerce

Government & Public Sector